Sunday, December 21, 2008

Projects....

The crown molding is stained and installed. The Venetian plaster is all but done on the entire ceiling......it took forever to do but it was worth it.



.....now I get to start on the flooring, the replacement of my 3 remaining hollow crap doors, and my stained glass for the windows on each side of the fireplace.....once the stained glass is done, it will replace the white mini blinds in the picture above. I actually have one panel already cut so the grinding of the glass will start today...

1 comment:

Kim said...

You've done a beautiful job with everything.